Skip to main content

Floating

Follow this guide to build a case using floating turbines.

The case you'll build contains the following:

  • Assets: 3 x 8.4 MW WTGs.
  • Components:
    • Blades: transported from Southampton, UK.
    • Floaters: transported from Lisnave, Setúbal, Portugal.
    • Nacelles and tower components: transported from Esbjerg, Denmark.
  • Location: off the coast of Viana do Castelo, Portugal.
  • Integration base: Ferrol, Spain.
  • Wet storage base: Ferrol wet storage, Spain.

These are the tasks required for our WTG floater package:

  1. Component transport:
    1. Floater
    2. Blades
    3. Tower components
    4. Nacelles
  2. Component assembly:
    1. Tower assembly
    2. Floating tower
    3. Floating WTG
  3. Transport to wet storage
  4. Installation of floating WTG
  5. Commissioning
  6. Testing
  7. Full simulation

This guide is split into 3 parts: