Floating
Follow this guide to build a case using floating turbines.
The case you'll build contains the following:
- Assets: 3 x 8.4 MW WTGs.
- Components:
- Blades: transported from Southampton, UK.
- Floaters: transported from Lisnave, Setúbal, Portugal.
- Nacelles and tower components: transported from Esbjerg, Denmark.
- Location: off the coast of Viana do Castelo, Portugal.
- Integration base: Ferrol, Spain.
- Wet storage base: Ferrol wet storage, Spain.
These are the tasks required for our WTG floater package:
- Component transport:
- Floater
- Blades
- Tower components
- Nacelles
- Component assembly:
- Tower assembly
- Floating tower
- Floating WTG
- Transport to wet storage
- Installation of floating WTG
- Commissioning
- Testing
- Full simulation