Crane (CRANE) Inputs
This article contains information about the different inputs available for the Crane (CRANE). For other transport inputs, please see Transportation input overview.
General Information
Input Label | Mandatory | Description |
---|---|---|
Name | ✅ | The official name of the transportation. |
Crane capacity | ❌ | The capacity is the maximal number of Pax which can be transferred with the transportation. |
Average speed | ❌ | The average speed defines the maximum speed of the transportation (in km/h). |
Radius | ❌ | The radius is the maximum radius the crane can reach. |
Type | ✅ | The type defines the kind of transportation. Depending on the type, different input boxes are available. |
Base | ✅ | The base is the harbour, airport or similar, used as the point of departure on the way to the base or as a base. |
ID | ❌ | The ID is a unique value to identify the transportation. |
Work package | ❌ | The transport can be assigned to a certain work package. |
Current Location
Input Label | Mandatory | Description |
---|---|---|
Latitude | ❌ | The latitude where the transport is currently stationed. |
Longitude | ❌ | The longitude where the transport is currently stationed. |
Certificates
Input Label | Mandatory | Description |
---|---|---|
Add certificate | ❌ | List of certificates that can be assigned to the transport, after which you can select the certificate's validity. |
Certificate groups | ❌ | Automatically assigned, depending on the certificate selected, as certificates can be assigned to certificate groups. |
Required Skills
Input Label | Mandatory | Description |
---|---|---|
Add required skills | ❌ | Qualification defines which single or grouped qualification is necessary for every single technician to enter the transportation. |
Required Skill Groups
Input Label | Mandatory | Description |
---|---|---|
Add required skill groups | ❌ | Qualification defines which grouped qualification is necessary for every single technician to enter the transportation. |
Costs
Input Label | Mandatory | Description |
---|---|---|
Day rate | ❌ | The day rate is the price of transportation per day. |
Fuel costs | ❌ | The fuel costs are the price for every litre of fuel. |
Mobilisation cost | ❌ | The mobilisation cost is the price per mobilisation. |
Weather Criteria
Input Label | Mandatory | Description |
---|---|---|
Wind speed lifting limit | ❌ | The wind speed lifting limit is the maximal wind for the crane to lift. |
Fuel Consumption
Input Label | Mandatory | Description |
---|---|---|
Total fuel consumption per day | ❌ | The total fuel consumption per day is the averaged sum of fuel consumption per day (litre/day). |
Activity Durations
Input Label | Mandatory | Description |
---|---|---|
Mobilising time | ❌ | The mobilising time per port visit is the averaged time that the crane needs to prepare in the base before it starts working. |
Demobilising time | ❌ | The demobilising time per port visit is the averaged time that the crane needs to prepare in the base after finishing the work. |
Connection time | ❌ | The connection time is the averaged time that the transport needs to get out of the usual transit in the position to transfer an employee. |
Disconnection time | ❌ | The disconnection time is the averaged time that the transport needs to get out of the transfer position in the usual transit status. |