Configure tasks
info
Design Construction only.
The Tasks tab of your assets provides centralized management of the entire asset workflow, from transport and assembly, through installation, to commissioning and testing. Assign and organize asset tasks, including dependencies, to model any real-world construction scenario. These instructions require a Shoreline Design Construction case with an asset added.
info
Add logistics to your case before configuring asset tasks. You will need to select the logistic as part of the task configuration.
- Open your Shoreline Design Construction case.
- Click on the Build tab.
- Click on the Assets tab.
- Click on the relevant asset.
- Click on the Tasks tab.
- Click + Add task.
- Complete the task inputs.
- Continue adding tasks as required.
- Click Save.